Prestressed Concrete Bridges
![]() Oboro Ohasi Bridge |
Long, large arch bridge construction methods
An arch bridge lends itself to construction under various topographical or environmental conditions. |
Furukawa Viaduct |
Precast segment method
The precast segmental approach is superior to other bridge construction methods because it allows, the construction period to be shortened. Using this method, a U-type core segment bridge with ribs, the latest type of precast segmental bridge, can be constructed. The Furukawa Viaduct, which was completed in 2002, is the first U-type core segmented bridge with ribs to be constructed in the world. |
|
Corrugated steel web bridge
By adopting corrugated steel webs constructed by light weight working platform instead of concrete webs constructed by conventional working platform, we are able to reduce the costs of construction machinery and materials greatly. In addition, by streamlining the work process, through the installation of precast ribs and embedded precast forms on the upper deck slab, we are able to shorten the construction period significantly and reduce the construction cost simultaneously. |
|
SPER and ML methods
We use both the SPER and ML methods to construct bridges quickly whilst at the same time economizing on the use of manpower. Using the SPER method, precast panels with embedded hoop reinforcements are installed to form the bridge surface. Concrete is then placed into these precast panels so that a composite bridge structure with high aseismic performance can be constructed. Using the ML method, external ribbed steel pipes and reinforcements are installed in the direction of the bridge pier axis and concrete is placed to make a concrete and steel composite bridge pier. |