Facility Usage
| Location | Cambodia |
|---|---|
| Completed Year | 2015 |
| Overview | 3 Span Continuous PC Cable Stayed Bridge(Main Bridge) L=640m, W=16.98m |
| Location | Cambodia |
|---|---|
| Completed Year | 2015 |
| Overview | 3 Span Continuous PC Cable Stayed Bridge(Main Bridge) L=640m, W=16.98m |