Facility Usage
Location | Vietnam |
---|---|
Completed Year | 2020 |
Overview | Total Construction Length=2,682.5m Length of Bridge Total=2,243.7m approach road L=438.8m Substructure:Cast-in place piles D1.2m 534piles, Length 27.5m~42.5m Abutment=1, T-Pier=45, Gantry pier=7,Steel pier head=2 Supersturcture:Super-T giredr bridge:Total number of Super-T 563pcs Continuous steel box girder bridge 3spans、62.1m+78.0m+62.1m=202.2m MSE wall L=143.8m Drainage system, Traffic sign board/Lighting system |