Hanoi City Ring Road No.3 Construction Project, Mai Dich - South Thang Long Section Package 1

Facility Usage

Location Vietnam
Completed Year 2020
Overview Total Construction Length=2,682.5m
 Length of Bridge Total=2,243.7m
 approach road L=438.8m

Substructure:Cast-in place piles D1.2m 534piles, Length 27.5m~42.5m
Abutment=1, T-Pier=45, Gantry pier=7,Steel pier head=2
Supersturcture:Super-T giredr bridge:Total number of Super-T 563pcs
Continuous steel box girder bridge 3spans、62.1m+78.0m+62.1m=202.2m
MSE wall L=143.8m
Drainage system, Traffic sign board/Lighting system