Construction of Prestressed Concrete Tower for Wind Turbine

Structural Features of Concrete Segment

WT_Tower_01.png

Construction Sequence (SMCC Method)

WT_Tower_02.png

SMCC Self-climbing System

✔ No big crane is needed.

WT_Tower_03.png

✔ Nacelle can be set on the equipment beforehand of tower construction.

✔ Blades can be installed during lower height stage of construction or after completion of tower by using self-climbing equipment.

✔ Therefore, a huge crane for tower, nacelle and blade is not necessary.

WT_Tower_04.png