Construction of Prestressed Concrete Tower for Wind Turbine
Structural Features of Concrete Segment
![WT_Tower_01.png](/en/assets/uploads/thchnology/WT-tower/WT_Tower_01.png)
Construction Sequence (SMCC Method)
![WT_Tower_02.png](/en/assets/uploads/thchnology/WT-tower/WT_Tower_02.png)
SMCC Self-climbing System
✔ No big crane is needed.
![WT_Tower_03.png](/en/assets/uploads/thchnology/WT-tower/WT_Tower_03.png)
✔ Nacelle can be set on the equipment beforehand of tower construction.
✔ Blades can be installed during lower height stage of construction or after completion of tower by using self-climbing equipment.
✔ Therefore, a huge crane for tower, nacelle and blade is not necessary.
![WT_Tower_04.png](/en/assets/uploads/thchnology/WT-tower/WT_Tower_04.png)